PS

Ps

Construction, 192 West 9th Street, St.Paul, Minnesota, 55102, United States, 1-10 Employees

pourstrip0.com

  • LinkedIn

phone no Phone Number: +17*********

Who is PS

Eliminate pour strips with the PS= Mechanical Rebar Splice System. Pour strips are often specified to control shrinkage, creep and elastic shortening in post-tensioned and cast-in-place c...

Read More

map
  • 192 West 9th Street, St.Paul, Minnesota, 55102, United States Headquarters: 192 West 9th Street, St.Paul, Minnesota, 55102, United States
  • 1979 Date Founded: 1979
  • 1-10 Employees: 1-10
  • dollar-icon Revenue: $500 Million to $1 Billion
  • tech-icon Active Tech Stack: See technologies

industries-icon Industry: Construction

SIC SIC Code: 3231

checked-icon Does something look wrong? Fix it. | View contact records from PS

PS Org Chart and Mapping

Employees
signout-image
You are signed out

Sign in to CIENCE GO Data to uncover contact details

crown-icon Free credits every month

Frequently Asked Questions Regarding PS

Answer: PS's headquarters are located at 192 West 9th Street, St.Paul, Minnesota, 55102, United States

Answer: PS's phone number is +17*********

Answer: PS's official website is https://pourstrip0.com

Answer: PS's revenue is $500 Million to $1 Billion

Answer: PS's SIC: 3231

Answer: PS has 1-10 employees

Answer: PS is in Construction

Answer: PS contact info: Phone number: +17********* Website: https://pourstrip0.com

Answer: Eliminate pour strips with the PS= Mechanical Rebar Splice System. Pour strips are often specified to control shrinkage, creep and elastic shortening in post-tensioned and cast-in-place concrete. Without redesign, the PS= System eliminates pour strips, while allowing for volume change in the slab and providing structural continuity. PS= stands for pour strip zero. It utilizes proven coupler technologies that have been used worldwide for decades. With a tapered thread on one end and a grout-filled sleeve on the other, this patented system meets ACI Type 1 and Type 2 mechanical splice requirements, is ICC approved and made in the USA. Now you can eliminate pour strips, the construction delays, extra costs and safety issues they bring with the PS= Mechanical Rebar Splicing System.

Answer:

Premium Sales Data for Prospecting

  • Sales data across over 200M records

  • Up-to-date records (less decayed data)

  • Accurate Email Lists (real-world tested)

  • Powerful search engine and intuitive interface

lock icon Get Full Access