City Of Haverhill
Government Administration, , Massachusetts, United States, 11-50 Employees
Who is CITY OF HAVERHILL
Water Maintenance is responsible for operating, maintaining and repairing the water distribution system; installing new water mains, implementing the backflow prevention program; reviewin...
Read More
- Headquarters: Massachusetts, United States
- Employees: 11-50
- Revenue: $50 Million to $100 Million
Industry: Government Administration
SIC Code: 9161 | NAICS Code: 921140 | Show More
Does something look wrong? Fix it. | View contact records from CITY OF HAVERHILL
City of Haverhill Org Chart and Mapping
Sign in to CIENCE GO Data to uncover contact details
Free credits every month
Frequently Asked Questions Regarding City of Haverhill
Answer: City of Haverhill's headquarters are located at Massachusetts, United States
Answer: City of Haverhill's official website is https://ci.haverhill.ma.us
Answer: City of Haverhill's revenue is $50 Million to $100 Million
Answer: City of Haverhill's SIC: 9161
Answer: City of Haverhill's NAICS: 921140
Answer: City of Haverhill has 11-50 employees
Answer: City of Haverhill is in Government Administration
Answer: City of Haverhill contact info: Phone number: Website: https://ci.haverhill.ma.us
Answer: Water Maintenance is responsible for operating, maintaining and repairing the water distribution system; installing new water mains, implementing the backflow prevention program; reviewing plans for new water mains and services; approving new water service applications; and maintaining records of the distribution system. The distribution system is the network of pipes and the associated fittings, valves, hydrants and appurtenances that transports water throughout the City. Most of the distribution system is located within the city street right-of-ways. A small percentage is located in cross-country easements. Water is pumped into the distribution system from the water treatment plant on Kenoza Lake. The distribution system includes approximately 235 miles of pipe that range in size from 2-inch up to 36-inch. Pipe materials include unlined cast iron, lined cast iron, ductile iron, transite, and PVC. Pressures and storage throughout the system are maintained by three concrete storage tanks and 5 booster pumping stations throughout the City. The pumping stations operate to fill storage tanks and/or pressurize separate high pressure zones.
Answer:
Premium Sales Data for Prospecting
-
Sales data across over 200M records
-
Up-to-date records (less decayed data)
-
Accurate Email Lists (real-world tested)
-
Powerful search engine and intuitive interface
Sign in to CIENCE GO Data to uncover contact details
Free credits every month